Bill Of Materials
|
|
Item |
Quantity |
Weight (kg)* |
Volume (cbm)* |
Annotations |
| Front Panel |
1 |
75 |
0.21 |
Reinforced PVC, 610 gr/m2, HF welding |
| Back Panel |
1 |
73 |
0.21 |
Reinforced PVC, 610 gr/m2, HF welding |
| Roof & Sides |
1 |
130 |
0.35 |
Reinforced woven PE 320gr/m2, hot air welding |
| Floor |
1 |
68 |
0.21 |
Reinforced woven PE 320gr/m2, hot air welding |
| US Anchor DB68 |
50 |
50 |
0.1 |
|
Pipe 200 cm, 1.5" diameter |
40 |
202 |
0.14 |
galvanized |
| Ventilator 36" |
2 |
70 |
1.21 |
|
| Entrance port |
1 |
15 |
0.1 |
|
| Auxilliary Equipment |
1 |
20 |
0.1 |
Installation equipment, additional equipment, repair kit |
| Total |
|
703 |
2.6 |
|
|
*Weight and volumes are best estimates for GP-ST 600. For GrainPro-ST-1200, add
1/3 to weights, volumes, and quantity of anchors and pipes.
|
Inflation unit: total volume of building:1,500 cbm (GPST 600) / 3,000 cbm (GPST 1200).
2 inflation blowers, 36" diameter, inflation capacity of 24.000 m3/hr each.
Cap.1.5 HP (1.15 kw), 3 phase. For sustaining inflation of the construction only
one blower is needed. The second ventilator has only to become active in those cases
where the main door will remain open. Size of the ventilator: 105 x 35 x 105 cm.
Auxiliary Installation Equipment: equipment for inserting anchors, frame for
entrance door, slides for zippers, tension straps for holding down deflated tunnel
in case of high winds.
Repair Kit Includes: one 3 kg hammer, one small hammer, and one anchor adapter pipe.
Generator (optional): 3 phase, diesel, self-starting, 6 KVA.
Warranties:
- Supertunnel -- Five (5) years;
- Blowers -- One (1) year.
Deflation Speed:
- (blowers off): 10 minutes;
- (blowers reversed): 5 minutes
Wind Tolerance:
- Maximum allowable wind speed: 80 km/hr.
- In winds in excess of 80 km/hr, turn off fans, and strap down.
|